Heinz Field
					Pittsburgh , PA
					
						The Project: 
- Intricate field heating system with long horizontal runs with a great number of elbows serving eight (8) Thermal Solution EVH-2000 condensing boilers.
 
- Domestic water heater system running both horizontally and vertically with many elbows serving two (2) A.O. Smith 4,000MBH water heaters.
 
- Many elbows involved.
 
ENERVEX Solution: 
- Field heating system vented with a multi-fan demand-controlled Mechanical Draft System.
 
- Domestic water heater system vented with Termination-mounted demand-controlled Mechanical Draft System.
 
- Two water heaters on the concourse levels are also vented with demand-controlled Mechanical Draft Systems.
 
					 
 
									PROJECT DETAILS
						installationYear
						2001
						architect
						HOK Sport, Kansas City, KS
						
					PRODUCTS USED