Heinz Field
Pittsburgh , PA

The Project:

  • Intricate field heating system with long horizontal runs with a great number of elbows serving eight (8) Thermal Solution EVH-2000 condensing boilers.
  • Domestic water heater system running both horizontally and vertically with many elbows serving two (2) A.O. Smith 4,000MBH water heaters.
  • Many elbows involved.

ENERVEX Solution:

  • Field heating system vented with a multi-fan demand-controlled Mechanical Draft System.
  • Domestic water heater system vented with Termination-mounted demand-controlled Mechanical Draft System.
  • Two water heaters on the concourse levels are also vented with demand-controlled Mechanical Draft Systems.

PROJECT DETAILS

installationYear

2001

architect

HOK Sport, Kansas City, KS